Title |
Releasing time |
Loading 58.7m LM blades in five (5) tiers in Qinhuangdao, China |
2014-06-17 |
Capt.Bill Xia finished the study at Europe from 16th-27th May, 2014 |
2014-06-03 |
Loading Siemens Blades in Lingang Terminal, Shanghai, China |
2014-04-23 |
Loading Yacht 118mts in Xiamen, China |
2014-04-16 |
CMS Capt Bill joined the BREAK BULK CONFERENCE-Heavy Lift Masterclass |
2014-03-17 |
Notification of Changing Company Address (公司地址变更通知函) |
2014-02-26 |
First shipment for SE Shipping Lines Pte. Ltd. in Tianjin, China |
2014-01-23 |
Loading Transformer and accessories in Shanghai, China |
2014-01-16 |
Flatwagon and Boogie inspection in Meishan, Sichuan, China |
2014-01-03 |
Loading accommodation units in Zhuhai, China |
2013-11-19 |
MSW Inspection, witness loading of sub-mergible ship MV Blue Marlin |
2013-10-10 |
Marine Warranty Survey for CARGOTEC - 270MT Crane Loading |
2013-09-12 |
First shipment for SAL Heavy Lift GmbH in Nantong ZPMC jetty |
2013-09-02 |
Loading equipment on Ro-Ro ship |
2013-08-23 |
Loading LNG gas module at Nantong Sinopacific Offshore Engineering Co., Ltd. |
2013-08-16 |
RIo-rito Wagons loading at port of Lianyungang & Dalian |
2013-07-29 |
520MT Offshore equipment loading |
2013-06-06 |
Propeller and steel works loading |
2013-05-13 |
Worked for SKULD Oil Tanker loading at Lianyungang |
2013-04-23 |
Heavy lift transportation Seagoing vessel-Barge-Trailer-Factory |
2013-04-16 |